upper waypoint

Caltrans Engineers Testing Bay Bridge Bolts For Long-Term Rusting

Save ArticleSave Article
Failed to save article

Please try again

RS6025_IMG_2234-sfi
Caltrans Engineer Bill Casey says crews will both submerge bolts in salt water to accelerate rust and put the bolts under extreme tension to test their strength. (Francesca Segre/ KQED)

By Francesca Segre

At the foot of the Bay Bridge in Oakland, a research laboratory is in full swing.

Engineers are testing the strength of bolts that are similar to those that snapped on the new span of the Bay Bridge earlier this year.

Caltrans Engineer Bill Casey says the engineers are submerging the bolts in salt water to accelerate rust ... then they'll put the bolts under extreme tension.

"This will replicate decades of exposure to the harsh environment of the Bay on whether these rods will ever break over the long, long term," Casey said.

Sponsored

The new eastern span of Bay Bridge was originally slated to open Labor Day weekend, but has been delayed as engineers install temporary and permanent fixes for the snapped bolts.

 

 

lower waypoint
next waypoint
California Housing Is Even Less Affordable Than You Think, UC Berkeley Study SaysCalifornia PUC Considers New Fixed Charge for ElectricityWill the U.S. Really Ban TikTok?Pro-Palestinian Protests on California College Campuses: What Are Students Demanding?Gaza War Ceasefire Talks Continue as Israel Threatens Rafah InvasionKnow Your Rights: California Protesters' Legal Standing Under the First AmendmentTunnels Under San Francisco? Inside the Dark, Dangerous World of the SewersUC’s President had a Plan to De-Escalate Protests. How did a Night of Violence Happen at UCLA?California Forever Shells out $2M in Campaign to Build City from ScratchOakland’s Leila Mottley on Her Debut Collection of Poetry ‘woke up no light’