upper waypoint

Caltrans: Bay Bridge Fix May Cost $10 Million, Delay Opening

Save ArticleSave Article
Failed to save article

Please try again

Less than four months before the planned opening of the new San Francisco-Oakland Bay Bridge, Caltrans is facing big questions about the steel used throughout the massive public works project. The agency released the results of an internal investigation on Wednesday, and officials acknowledged it may cost as much as $10 million to fix the mistake. »

Source: The California Report – Science

Sponsored

lower waypoint
next waypoint
Bay Area Cities Push to Legally Validate Polyamorous FamiliesWhat Is the 'Green Flash' at Sunset — and How Can You See It?California’s New 1600-Acre State Park Set to Open This SummerCalifornia's Plans for Slowing Climate Change Through Nature-Based SolutionsHoping for a 2024 'Super Bloom'? Where to See Wildflowers in the Bay AreaBlue Jellyfish-Like Creatures Ride California Waves: A Climate Change Indicator?What Are Those Weird, Pink Ponds in San Francisco Bay?Ever Wake Up Frozen in the Middle of the Night, With a Shadowy Figure in the Room?Everything You Never Wanted to Know About Snail SexThis is NOT a Dandelion.